Restoration update – August 2011
Last week the wooden carriage body was delivered to the Festiniog Railway engineering works at Boston Lodge for further assessment. The road transfer from the Museum Depot took place over a two day period, with the final part of the journey involving use of the narrow gauge railway line. The photograph shows the carriage being hauled as a special ‘out-of-gauge load’ through the local town of Porthmadog on its way to the workshop.


Leave a Reply